某氰化浸金尾渣中铅锌综合回收选矿试验研究  被引量:6

Experimental Study on Comprehensive Recovery of Lead and Zinc from Cyanide Leaching Gold Tailings

在线阅读下载全文

作  者:郭海宁[1] 陈杜娟[1] 苗梁 GUO Haining;CHEN Dujuan;MIAO Liang(Northwest Research Institute of Mining&Metallurgy,Baiyin 730900,Gansu,China)

机构地区:[1]西北矿冶研究院,甘肃白银730900

出  处:《有色金属(选矿部分)》2021年第5期60-66,共7页Nonferrous Metals(Mineral Processing Section)

摘  要:江西某氰化浸金尾渣中具有综合回收价值的金属元素主要为铅、锌,品位分别为2.25%和0.71%,尾渣中铅氧化率较高,矿物粒度细。针对该尾渣性质特点,试验研究采用"次氯酸钠预处理—铅锌优先浮选工艺"方案对铅、锌进行回收,闭路试验获得了铅品位为54.53%,锌含量为5.12%的铅精矿和锌品位为46.52%,铅含量为2.37%的锌精矿,指标良好,金属综合利用率高,并且工艺流程简单易实施,药剂制度经济合理,为该尾渣资源的综合利用提供了技术依据。The main metal elements with comprehensive recovery value in a cyanide leaching gold tailings in Jiangxi are lead and zinc,with Pb grade of 2.25%and Zn grade of 0.71%,respectively.The oxidation rate of lead in the tailings is high,and the mineral particle size is fine.According to the characteristics of the tailings,the experimental study adopted the scheme of sodium hypochlorite pretreatment-lead and zinc selective flotation process to recover lead and zinc.In the closed-circuit tests,lead concentrate with Pb grade of 54.53%,Zn content of 5.12%and zinc concentrate with Zn grade of46.52%,Pb content of 2.37%were obtained,which had good indexes and high comprehensive utilization rate of metal.The process is simple and easy to implement,the medicament system is economical and reasonable,and the technical basis is provided for the comprehensive utilization of the tailings resource.

关 键 词:氰化尾渣 次氯酸钠 预处理 铅锌优先浮选 综合回收 

分 类 号:TD923[矿业工程—选矿] TD952

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象