作 者:申光玉 SHEN Guang-yu(Sima Coal Industry Co.,Ltd.,Lu'an Chemical Group Co.,Ltd.,Changzhi 046000,China)
机构地区:[1]潞安化工集团司马煤业有限公司,山西长治046000
出 处:《机械工程与自动化》2021年第5期212-213,共2页Mechanical Engineering & Automation
摘 要:煤矿井下供电系统老化、越级跳闸等现象严重,导致供电稳定性差,供电设备损坏严重。为了解决该技术难题,司马矿供电队通过技术研究对二采区供电系统进行优化改进,给供电系统安装了一套DZ24L型漏电断路器,并对其动作电流值进行合理整定。实际应用表明:供电系统安装断路器后,提高了系统供电稳定性,降低了供电系统故障率,保证了采掘工作面机电设备安全高效运行,取得了显著的应用成效。The underground power supply system of coal mines is aging,overstepping tripping and other phenomena are serious,resulting in poor power supply stability and serious damage to power supply equipment.In order to solve this technical problem,the power supply team of Sima Mine optimized and improved the power supply system of the second mining area through technical research.A set of DZ24L leakage circuit breaker is installed for the power supply system,and its operating current value is reasonably set.From the actual application effect,the installation of circuit breakers in the power supply system improves the stability of the system power supply,reduces the failure rate of the power supply system,and ensures the safe and efficient operation of the electromechanical equipment in the mining face,and significant application results have been achieved.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.222.197.224