超超临界660 MW机组二次风量异常下降分析与研究  被引量:1

Analysis and Research on Abnormal Decrease of Secondary Air Volume of Ultra-Supercritical 660 MW Unit in Huaneng Changxing Power Plant

在线阅读下载全文

作  者:张红光 韩钟钟 潘友国 盛伟斌 郑书明 周小航 沈霄华 ZHANG Hongguang;HAN Zhongzhong;PAN Youguo;SHENG Weibin;ZHENG Shuming;ZHOU Xiaohang;SHEN Xiaohua(Huaneng Changxing Power Plant,Changxing 313100,Zhejiang Province,China;Huaneng Zhejiang Company,Hangzhou 310014,Zhejiang Province,China)

机构地区:[1]华能长兴电厂,浙江长兴313100 [2]华能浙江分公司,浙江杭州310014

出  处:《电力与能源》2021年第4期467-469,472,共4页Power & Energy

摘  要:华能长兴电厂2号机组在270~280 MW负荷运行时发生多次A侧二次风量突降情况,严重时甚至突降至0,锅炉总风量同步下降,对机组的安全稳定运行产生严重影响。对2号炉A侧二次风量突降的具体原因进行了分析。通过查阅历史数据并听取西安热工院的分析意见后,提出了解决二次风量突降问题的措施。During the operation of No.2 unit with 270~280 MW load in Huaneng Changxing Power Plant,the secondary air volume of side A dropped suddenly many times,and even dropped to 0 in serious cases,and the total air volume of the boiler dropped synchronously,which has serious impact on the safe and stable operation of the unit.In order to analyze the specific reasons for the sudden drop,Changxing Power Plant held a special seminar on the abnormal change of secondary air volume in A side of#2 furnace,consulted historical data and listened to the analysis opinions of Xi′an Thermal Engineering Institute,and discussed the current problems of the sudden drop of secondary air volume in the plant.

关 键 词:660 MW机组 二次风量突降 风量低保户 

分 类 号:TM621[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象