检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡哲睿 HU Zherui(China Railvuay Design Cor poration,Tianjin 300308,China)
出 处:《给水排水》2021年第9期104-108,共5页Water & Wastewater Engineering
摘 要:从设计实践出发,总结分析了青岛地铁8号线过海隧道提高系统运行安全、节能、智能的方案和措施:排水量的分阶段监测确定、水泵型式选择单级潜污泵、变频控制等措施减小水锤、增加排水备用管道和备用排水出路提高运行安全可靠性。设置分区截流辅助兼转输泵站、采用超级双相不锈钢材质本质防腐及水泵变频调节在各工况均处于高效区运行提高节能性。水泵、阀门、闸门等设备自动连锁控制、远程便捷操作控制和设备故障报警、液位报警,现场实时画面监控等措施提高运维智能性。Based on the design practice,this paper summarizes and analyzes the schemes and measures to improve the safety,energy saving and intelligence of the system,including stage monitoring and determination of water discharge,selection of single stage submersible sewage pump,frequency control and other measures to reduce water hammer,increasing spare drainage pipeline and standby drainage outlet to improve operation safety and reliability,auxiliary and transfer pumping station for district closure,using super duplex stainless steel essential anti-corrosion pump,and the frequency conversion regulation of pump operates in high efficiency area under all working conditions to improve energy saving;automatic interlock control of pump,valve,gate and other equipment,remote convenient operation and equipment fault alarm,liquid level alarm,on-site real-time screen monitoring and other measures to improve the operation and maintenance intelligence.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7