作 者:陆永亚 黄金根 李倩 LU Yongya;HUANG Jinggen;LI Qian(Huadian Electric Power Research Institute Co.,Ltd.,Hangzhou 310030,China)
机构地区:[1]华电电力科学研究院有限公司,浙江杭州310030
出 处:《人民长江》2021年第9期143-147,154,共6页Yangtze River
摘 要:船厢安装是构皮滩第一级下水式升船机设备安装的难点。首先,阐述了船厢气囊下水技术方案,分析了船厢下水过程中的气囊和船厢受力情况,据此实施了增设移运托架和助浮气囊、卧倒门加固等措施;其次,阐述了船厢浮运技术方案,介绍了船厢下水过程中的质量控制及船厢下水浮运工艺流程,实施了浮运拖曳和入室定位技术。工程实践表明:该船厢下水和浮运方案安全可靠,可为类似船厢安装提供借鉴。Ship chamber installation is a difficulty in the equipment installation of the first class launching type ship lift in the Goupitan Hydropower Station.Firstly,this paper introduced the technical scheme of chamber launching by airbag,analyzed the load condition of air bag and the cabin during chamber launching.Accordingly,reinforcement measures such as additional transport carrier and auxiliary air bag,and reclining door were implemented.Secondly,the ship floating technical scheme was elaborated,the quality control and the ship launching process were introduced,and the floating towing and entry positioning technology were implemented.Engineering practice showed that the ship lift chamber launching and floating scheme was safe and reliable,which can provide reference for similar ship lift chamber installation.
分 类 号:TV547.9[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7