检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘法志 吴桂福 顾春阳 李沙 LIU Fazhi;WU Guifu;GU Chunyang;LI Sha(Huadian Electric Power Research Institute Co.,Ltd.,Hangzhou 310030,Zhejiang,China;Ili Coal Electricity Co.,Ltd.,State Grid Energy Development Company,Ili 835000,Xinjiang,China)
机构地区:[1]华电电力科学研究院有限公司,浙江杭州310030 [2]国网能源伊犁煤电有限公司,新疆伊犁835000
出 处:《能源与节能》2021年第9期103-107,共5页Energy and Energy Conservation
摘 要:一350 MW超临界锅炉投产后,一直存在再热器减温水量大及冷灰斗结焦严重等问题。通过一系列的调整试验,总结出现问题的主要原因是炉底漏风量较大,热二次风箱压力偏低,再热器设计面积偏大,1号、3号角冷灰斗区域加装了耐磨浇注料等,并提出了优化改进措施。A 350 MW supercritical boiler existed excessive reheater attemperating water and ash hopper slagging after putting into production.Through a series of adjustment tests,it was concluded that the main reasons for the problems were the large boiler bottom air leakage,the low pressure of hot secondary air box,the large designed area of reheater,adding of wear-resistant castables in the No.1 and No.3 cool slag hopper area and etc.,and put forward the optimization and improvement measures.
关 键 词:再热器 减温水量 冷灰斗结焦 炉底漏风 热二次风箱压力
分 类 号:TK229.2[动力工程及工程热物理—动力机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7