检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:武龙飞 杨广庆 马保良 Wu Longfei;Yang Guangqing;Ma Baoliang(College of Metallurgy and Energy, North China University of Science and Technology,Tangshan 063210,Hebei;Xingtai Iron & Steel Corp.,Ltd.,Xingtai 054027,Hebei)
机构地区:[1]华北理工大学冶金与能源学院,河北唐山063210 [2]邢台钢铁有限责任公司,河北邢台054027
出 处:《河北冶金》2021年第9期8-10,61,共4页Hebei Metallurgy
摘 要:随着我国钢铁冶炼技术的不断进步,以及国家对环境治理力度的进一步严苛,绿色冶金逐渐被钢铁行业重视。介绍了HIsmelt熔融还原工艺的发展历程,并与传统高炉炼铁工艺进行了对比,认为其真正替代高炉炼铁工艺在全国范围推广还有很多亟待解决的问题。结合现阶段HIsmelt工艺在实际生产中存在炉衬寿命低、矿粉预还原度低和热能利用率低的问题,提出一些改进方向和设想。With the continuous progress of Chinese iron and steel smelting technology and the further severity of national environmental governance,green metallurgy has gradually been paid attention to by the iron and steel industry.The development process of Hlsmelt smelting reduction process is introduced.Compared with the traditional blast furnace iron-making process,it is considered that there are still many problems to truly replace the blast furnace iron-making process in the whole country.Combined with the low lining life,low pre reduction degree of ore powder and low thermal energy utilization in the actual production of Hlsmelt process at the present stage,some improvement directions and ideas are put forward.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.90