检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:高天宇 马麟 GAO Tianyu;MA Lin(Xitieshan Branch,West Mining Co.,Ltd.;Daye Nonferrous Design&Research Institute Co.,Ltd.)
机构地区:[1]西部矿业股份有限公司锡铁山分公司,青海省海西蒙古族藏族自治州816203 [2]大冶有色设计研究院有限公司
出 处:《现代矿业》2021年第9期80-83,共4页Modern Mining
摘 要:锡铁山铅锌矿存在采空区数量多、规模大、空间关系复杂的问题。为了安全开采深部矿体,采用3DMine软件建立铅锌矿采空区立体可视化模型,掌握采空区的三维形态,统计出采空区体积总量超过900万m³。对采空区进行现场调查与分析,从安全、成本、治理周期等方面对不同的治理方案进行比选。结果得出,该铅锌矿采空区治理适合封闭隔离和崩落围岩形成缓冲垫层的方案。The Xitieshan Lead-zinc Mine has the problems of a large number of goafs,a large scale,and complex spatial relationships.In order to safely mine deep ore bodies,3DMine software is used to establish a three-dimensional visualization model of the lead-zinc mine goaf,master the three-dimensional form of the goaf,and calculate that the total volume of the goaf exceeds 9 million m^(3).Field investigation and analysis were carried out on the goaf,and different treatment schemes were compared and selected from the aspects of safety,cost and treatment cycle.The results show that the goaf treatment of the lead-zinc mine is suitable for the scheme of closed isolation and formation of buffer cushions in collapsed surrounding rock.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112