检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:徐福海 王文斌[2] XU Fuhai;WANG Wenbin(Shenhua Guohua Guangtou Liuzhou power generation Co.,Ltd.,Liuzhou 545600,China;Harbin turbine Co.,Ltd.,Harbin 150046,China)
机构地区:[1]神华国华广投(柳州)发电公司,广西柳州545600 [2]哈尔滨汽轮机厂有限责任公司,哈尔滨150046
出 处:《黑龙江电力》2021年第4期346-350,共5页Heilongjiang Electric Power
摘 要:针对柳州电厂新建350 MW超临界供热机组辅机单列设计,从技术可行性、可靠性和投资经济性进行综合分析。通过分析单列设计,从降低工程投资和节约运行维护费用两个方面概述单列设计的经济性,重点从机械和控制系统方面描述采取的技术控制措施。机组交付生产后安全稳定可靠经济运行,实现单列辅机设计应用目标。Aiming at the single row design of auxiliary equipment of newly-built 350 MW supercritical heating unit in Liuzhou Power Plant,a comprehensive analysis is made from the aspects of technical feasibility,reliability and investment economy.By analyzing the single row design,this paper summarizes the economy of single row design from two aspects of reducing project investment and saving operation and maintenance cost,and focuses on the technical control measures taken from the aspects of machinery and control system.After putting into operation,the unit runs safely and reliably,and achieves the design goal of single row.
关 键 词:供热机组 电厂辅机 单列设计 热经济性 可行性分析
分 类 号:TM621.7[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.216.230.65