检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Tuo Chen Hani S.Mitri
机构地区:[1]Department of Mining and Materials Engineering,Mc Gill University,Montreal,Quebec H3A 0E8,Canada
出 处:《International Journal of Mining Science and Technology》2021年第5期975-982,共8页矿业科学技术学报(英文版)
基 金:financially supported by the Natural Science and Engineering Research Council(NSERC)-Discovery Grants Program。
摘 要:Steeply dipping,vein and tabular orebodies are traditionally extracted with longitudinal retreat mining methods such as Eureka and Avoca in a bottom-up sequence with delayed backfill.To increase productivity,sill pillars in the orebody are used to separate mining zones thus allowing production to take place simultaneously in two or more zones.While such mining methods are productive,they may be accompanied with high volumes of hanging wall overbreak causing significant unplanned ore dilution.In this work,it is shown through a mine design case study of a narrow vein deposit that a sill pillar could also play a significant role in limiting hanging wall overbreak.To demonstrate the role of sill pillar,a novel numerical modelling scheme is proposed to account for progressive stope wall overbreak.A numerical modelling approach of element death and rebirth is developed to allow for the detected stope overbreak to be immediately removed and replaced with backfill material before upper-level stope extraction.It is further shown that the average overbreak volume could be reduced by as much as 33%when the sill pillar is strategically placed in the lower half of a mine plan.
关 键 词:Underground mine design Longitudinal mining Sill pillar design Unplanned ore dilution Numerical modelling
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.190.154.145