检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:常胜[1] Chang Sheng(Xinjiang Survey and Design Institute of Water Resources and Hydropower,Urumqi 830000,Xinjiang)
机构地区:[1]新疆水利水电勘测设计研究院,新疆乌鲁木齐830000
出 处:《陕西水利》2021年第10期144-147,共4页Shaanxi Water Resources
摘 要:针对五一水库管理区供水工程,结合工程区地形、地质、水文和气象等情况,提出了坝前式和坝后式两种供水方案。坝前式供水方案以五一水库为水源,采用湿井型深井泵取水方式;坝后式供水方案以天然河道为水源,采用渗管取水方式。并从工程建设难易程度、取水条件、运行检修、投资大小等方面进行对比分析,推荐采用坝前式供水方案。Aiming at the water supply project in the Wuyi Reservoir Management Area,combined with the topography,geology,hydrology and meteorology of the project area,two water supply schemes of the front-dam type and the rear-dam type are proposed.The front-dam water supply scheme uses Wuyi Reservoir as the water source and uses wet-well deep-well pumps to take water.The back-dam water supply scheme uses natural rivers as water sources and uses seepage pipes to take water.In addition,a comparative analysis was made in terms of the difficulty of project construction,water intake conditions,operation and maintenance,and investment size.It is recommended to use the front-dam water supply scheme.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.147.211