检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:高军武 Gao Junwu(Nanjing Port Machinery Heavy Industry Manufacturing Co.,Ltd.)
机构地区:[1]南京港机重工制造有限公司
出 处:《港口装卸》2021年第5期38-39,68,共3页Port Operation
摘 要:在港口起重机械设计时,通常将起升载荷乘以一个大于1的系数,以对各部件的承载能力进行校核。对于紧停工况,设计规范及设计手册等未详细说明,通过实例对比,对紧停工况下载荷放大系数进行计算和对比,以便对紧停工况是否需要单独考虑进行探讨。In the design of port cranes,the lifting load is usually multiplied by a factor greater than 1 to check the carrying capacity of each component.For emergency shutdown situations,the design specifications and design manuals are not described in detail.Through the comparison of examples,the load amplification coefficient under emergency shutdown is calculated and compared,so as to discuss whether the emergency shutdown situation needs to be considered separately.
分 类 号:U653.921[交通运输工程—港口、海岸及近海工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200