作 者:章旭波 ZHANG Xubo(Ningbo Construction Group Co.,Ltd.,Ningbo,Zhejiang 315000,China)
机构地区:[1]宁波市建设集团股份有限公司,浙江宁波315000
出 处:《建筑施工》2021年第9期1826-1828,1832,共4页Building Construction
摘 要:为解决建筑施工过程中,传统外电防护架存在的稳定性差、连接节点薄弱以及操作难度大等弊端,通过调查研究,并从技术、安全、成本等多方面总结实践经验,提出创新性的外电防护架搭设方式。实践证明,该架体不仅安拆简便、稳定性好,并且做到了标准化的重复利用,具有较好的社会效益和经济效益,在类似的案例中具有推广价值。With the continuous advancement of urbanization in China,a large number of residential projects are put into construction.There are original high-voltage power transmission lines around the proposed sites of many projects,which are close to the new projects,so external power protection is needed.In order to solve the disadvantages of poor stability,weak connection nodes and difficult operation of the traditional external protection frame in the process of building construction,through investigation and research,and summarizing the practical experience from the aspects of technology,safety and cost,an innovative external protection frame erection method is proposed.The project practice shows that the frame is not only easy to install and disassemble,but also has good stability,and achieves standardized reuse.It has good technical and economic benefits,social and economic benefits,as well as promotional value in similar cases.
分 类 号:TU755.2[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222