胜利一号露天矿采区转向方式优化研究  被引量:8

Optimization of mining area steering scheme in Shengli No.1 Open-pit Coal Mine

在线阅读下载全文

作  者:孙俊东 SUN Jun-dong(Shenhua Beidian Shengli Energy Co.,Ltd.,Xilinhot 026000,China)

机构地区:[1]神华北电胜利能源有限公司,内蒙古锡林浩特026000

出  处:《煤炭工程》2021年第9期11-15,共5页Coal Engineering

摘  要:为探索胜利一号露天煤矿最优的采区过渡方式,以胜利一号露天煤矿生产现状为前提,结合经典模型公式确定了各采区合理的工作线长度,并依据露天矿采区划分及开采顺序,提出了3种采区过渡方案。方案研究过程中,通过模拟转向过渡开采过程的4个典型时期工程位置,从内排时间、外排量、二次剥离量等因素导致的生产经济指标变化情况,综合分析确定扇形转向为最优,能够在保证产量接续的同时最大化释放内排空间,经济效益显著。In order to explore the optimal mining area steering mode of Shengli No.1 Open-pit Coal Mine, based on the production status of the coal mine, the reasonable working line length of each mining area is determined combining with the classical model formula, and three steering schemes of the mining area are put forward according to the mining area division and mining sequence.Through simulating the four typical engineering positions in steering period of mining, the changes in production economic indicators are analyzed, which are caused by internal dumping time, external dumping amount, secondary stripping amount and other factors.The analysis shows that the sector steering is the optimal scheme, which can maximize the release of internal dumping space while ensuring the production continuity, and the economic benefit is remarkable.

关 键 词:露天煤矿 工作线长度 采区过渡 转向方式 

分 类 号:TD824[矿业工程—煤矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象