作 者:贾利峰 JIA Lifeng(CHD Huadian Laizhou Power Generation Co.,Ltd.,Laizhou 261400,Shandong,China)
机构地区:[1]中国华电集团华电莱州发电有限公司,山东莱州261400
出 处:《能源与节能》2021年第10期188-189,共2页Energy and Energy Conservation
摘 要:山东A电厂1000 MW机组为高压缸启动方式,自投产以来一直存在冷态启动中压缸膨胀不均、轴承振动大、中速暖机时间长等问题。针对这些问题,在吸取国内百万机组中压缸启动方式经验的基础上,在锅炉升温升压时段,利用邻机冷段抽汽对中压缸进行冲转提前预暖,在主蒸汽参数满足冲转条件后再打闸机组进行高中压缸联合冲转。结果表明,这种启动方式与高压缸启动方式相比,能够有效提高中压缸暖缸效果,避免中压缸膨胀不均造成的轴承振动大问题,大大缩短了冷态启机时间,经济和环保效益显著。The 1000 MW unit of Shandong A Power Plant is a high-pressure cylinder start-up method.Since it was put into production,there had been problems such as uneven expansion,large bearing vibration and long medium-speed warm-up time of the intermediate pressure cylinder.In response to these problems,based on the experience of the intermediate pressure cylinder start-up method of millions of domestic units,during the boiler heating and boosting period,the cold section of the adjacent unit is used to preheat the intermediate pressure cylinder in advance,and the brake unit will perform the combined flushing of the high and medium pressure cylinders after the main steam parameters satisfy the flushing conditions.The results show that compared with the high-pressure cylinder startup method,this start-up method can effectively improve the heating effect of the intermediate pressure cylinder,avoid the bearing vibration problem caused by the uneven expansion of the intermediate pressure cylinder,and greatly shorten the cold start-up time,which is of significant economical and environmental benefits.
关 键 词:冷态启动 中压缸冲转 暖缸效果 经济效益 环保效益
分 类 号:TM621.2[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7