检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨颖[1] 刘友波[1] 黄媛[1] 刘俊勇[1] 王潇笛 YANG Ying;LIU Youbo;HUANG Yuan;LIU Junyong;WANG Xiaodi(College of Electrical Engineering,Sichuan University,Chengdu 610065,China)
出 处:《电力建设》2021年第10期9-18,共10页Electric Power Construction
基 金:四川省科技计划项目(2021YFSY0053)。
摘 要:推进园区电能替代是改善环境问题的重要措施,针对综合园区能源系统进行电能替代受配电网络改造限制的情况,提出采用风光储系统作为供电系统的方案。首先构建综合园区能源系统中电替热、电替冷和电替油负荷模型。然后提出考虑配电网运行状态和需求响应的风光储最优容量双层配置模型,该模型包括配电网层和风光储系统层。最后采用Cplex进行求解,得到综合园区电能替代下考虑配电网运行状态和需求响应的风光储系统最优配置方案。通过IEEE 33节点系统以及某实际园区的电能替代负荷数据进行仿真计算,结果表明采用风光储系统供电并计及负荷的需求响应能解决园区电能替代负荷增长的需求并兼顾其最优经济配置。Promoting the electric energy substitution of integrated park is an important measure to improve environmental problems.The electric energy substitution of integrated park is affected by distribution network transformation.The program of electric energy substitution to configure wind-solar-battery system is proposed.Firstly,the load characteristic model under electric energy substitution is established which involves the load models of electricity replacing heat,cooling and fuel oil.Secondly,the bi-level optimal model for wind-solar-battery capacity allocation is proposed considering the reliability of distribution network and the demand response,which is concluded distribution network layer and wind-solar-battery system layer.Finally,Cplex is used to solve the problem,and it is obtained the optimal planning scheme of the wing-solar-battery system considering the reliability of distribution network and the demand response in the electric energy substitution of the integrated park.In the system of IEEE 33-node system,the electric energy substitution load data of an actual park is used to perform simulation.The results show that the use of wind-solar-battery system for power supply and the consideration of load demand response can solve the demand for electric energy substitution load growth in the park and realize the wind-solarbattery system's optimal economic configuration.
关 键 词:电能替代 风光储系统 经济成本 环境效益 容量配置 需求响应
分 类 号:TM715[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117