检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:徐敬海 卜兰 杜东升[2] 王曙光[2] XU Jinghai;BU Lan;DU Dongsheng;WANG Shuguang(College of Geomatics Science and Technology,Nanjing Tech University,Nanjing 211816,China;College of Civil Engineering,Nanjing Tech University,Nanjing 211816,China)
机构地区:[1]南京工业大学测绘科学与技术学院,江苏南京211816 [2]南京工业大学土木工程学院,江苏南京211816
出 处:《建筑结构学报》2021年第10期215-222,共8页Journal of Building Structures
基 金:国家重点研发计划(2018YFC0704300,2018YFC1504503);江苏省建设系统科技项目(2018JH011)。
摘 要:建筑物BIM和实景三维模型分别是建筑和地理信息领域两种三维模型,二者融合后的模型除了可展示建筑物自身内部细节,还可以分析建筑物与周边环境的相互作用,为智慧城市相关领域中的应用提供基础与支撑。二者融合的难点表现在建筑物几何信息融合、建筑物子组件语义信息的整合,以及空间位置的配准等方面。设计了二者融合的框架,选取IFC模型作为融合前的源模型,3DTitles作为融合后的目标模型,论述了融合流程和方法,包括:1)重构BIM模型,根据建筑物构建类型,重构成子BIM模型;2)模型几何信息转换,采用中间交换格式法,选取obj和glTF格式实现交换;3)模型空间位置配准,先选取不同模型建筑物上的同名点,然后采用SVD算法计算配准参数完成配准;4)子组件语义信息映射,根据实景三维模型文件格式要求重新组织建筑物构建的语义信息。选取南京市某楼群开展了实验,验证了该融合方法,展示了此楼群BIM模型和实景三维模型的融合结果。总体上所论述的融合方法,除了可实现建筑物BIM与实景三维模型语义、几何和位置融合,在操作上除了需要手工选取同名点配准外,其他步骤均可通过程序自动实现,从而快速建立室内外一体化的建筑物模型。Building information model(BIM)and reality 3 D model are two kinds of building models in civil engineering and geographic information fields,respectively.The merged model may not only be used to present the detailed information of inner building,but also to analyze the interaction between building and the around environment,which can provide good support to the application in different fields of the smart city.The difficulties of the fusion are building geometric information fusion,semantic integration of sub-components of building and spatial position registration.For this,the framework of fusion was described in which the IFC model was selected as the source model and 3 DTitles model as the target model.The workflow and method of the fusion were discussed,including reconstruction of BIM model according to building components,geometric information transformation of the model using interchange format obj and glTF,spatial position registration according to the tie-points and SVD algorithm,and semantic mapping of building components regrading to the format of the reality 3 D model.Finally,experiment on buildings of a company is engaged to verify the proposed fusion method and display the fusion results.Overall,the method discussed in the paper is able to realize the fusion of BIM model and the corresponding reality 3 D model in perspective of semantics,geometry,and location.Meantime,the method can automatically realize the fusion steps except select registration tie-points,so as to quickly build an integrated indoor and outdoor building model.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.117.227.191