检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:叶雷 阮春丽 杨月霞 YE Lei;RUAN Chunli;YANG Yuexia(Yunnan Dianxiang Mining Industry Consultants Co.,Ltd.,Kunming 652017,China;Yunnan Chutian Engineering Testing Co.,Ltd.,Kunming 652017,China)
机构地区:[1]云南滇湘矿业咨询有限公司,云南昆明650217 [2]云南楚天工程检测有限公司,云南昆明650217
出 处:《中国矿业》2021年第S02期59-62,75,共5页China Mining Magazine
摘 要:昭平县元山金矿为小型金矿,在经过“教条主义”的勘查工作后,消耗了矿权人的勘查资金及投资热情,处于停滞阶段。本文在综合以往工作的基础上,分析认为在第二期勘查阶段中,勘查单位严格按设计开展勘查工作,勘查过程中不注重现象的总结,未能根据实际情况实时调整方案,导致勘查资金过量投入在次要成矿类型地区,因此难以取得找矿效果,成果投入时间比极不均衡。Yuanshan gold mine,which is a small-scale gold mine in Zhaoping county,is idle after the“dogmatism”geological prospecting stage.This stage,which will be discussed in this paper,has spent a lot of money and time and was carried out in strict accordance with its design.During the geological prospecting,the exploration agency failed to adjust its design with the changes of the geological situation,and excessive geological prospecting was carried out in ore free area,the ratio of the result to investment and time becomes extremely uneven.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7