紫金矿大断面岩巷快速掘进技术实践  被引量:1

Practice of fast mining technology for large section rock roadway in Zijin Mine

在线阅读下载全文

作  者:张献波 Zhang Xianbo(Jinzhong Company,Jinneng Holdings Coal Group,Jinzhong 030600,China)

机构地区:[1]晋能控股煤业集团晋中公司,山西晋中030600

出  处:《煤炭与化工》2021年第9期17-19,共3页Coal and Chemical Industry

摘  要:晋能控股集团紫金矿通过分析现有炮掘技术,得到了影响巷道掘进速度的主观因素和客观因素。在此基础上,设置矸石仓,采用侧卸式装岩机、优化施工组织等,提高了6煤轨道下山的掘进速度,日最大进尺为4.5 m,且巷道断面稳定,收缩率小,取得了较好的掘进效果。By analyzing the existing gunnery technology,Zijin Mine of Jinneng Holding Group obtained the subjective and objective factors affecting the speed of roadway digging.On this basis,setting gangue bin,adopting side discharge rock loader and optimizing construction organization improved the mining speed of 6 coal track downhill with a maximum daily mining of 4.5 m.Moreover,the roadway section was stable and the shrinkage rate was small,which achieved better results.

关 键 词:大断面 岩巷 矸石仓 轨道下山 

分 类 号:TD263.3[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象