江滩取水构筑物在超大洪水工况下的计算要点  

Main Points Calculation of River Beach Water Intake Structures with Massive Flood

在线阅读下载全文

作  者:李士民 强健 王林 Li Shimin;Qiangjian;Wanglin(Shanghai Municipal Engineering Design Institute(Group)Co.,Ltd.,200092,China)

机构地区:[1]上海市政工程设计研究总院(集团)有限公司,200092

出  处:《特种结构》2021年第5期29-32,共4页Special Structures

摘  要:随着近年来极端性天气频繁发生,我国多地沿江城市在汛期内往往会出现超大洪水。对位于江滩上的取水构筑物来说,当超大洪水来临时,如何考虑其对结构的影响,是结构工程师需要面临的问题。文章通过具体的工程实例,阐述了取水头部、原水自流管、取水泵房等主要江滩取水构筑物在超大洪水工况下的受力特性和设计思路,提出了有针对性的计算原则,有较强的可操作性。As extreme weather happens frequently in recent years,massive flood often occurs during the flood season in many alongriver cities.It is a problem for structural engineers to consider the impact of water intake structures on the river bank when the massive flood occurs.Based on a project,the mechanical characteristics and design ideas of water intake structures on the river bank were expounded,such as water intake head,raw water pipe,water intake pump house suffering the massive flood,and the specific calculation principles,which have strong operability,were put forward.

关 键 词:江滩构筑物 取水工程 超大洪水 汛期 

分 类 号:TU991.1[建筑科学—市政工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象