核电厂棒电源发电机滑环的更换  

Replacement of Slip Ring of the CRDM Power Generator in Nuclear Power Plant

在线阅读下载全文

作  者:王超 李嘉敏 包彦省 贾彬 高晗 WANG Chao;LI Jiamin;BAO Yanxing;JIA Bin;GAO Han(CNNP Nuclear Power Operations Management Co.,Ltd.,Haiyan 314300,China)

机构地区:[1]中核核电运行管理有限公司,浙江海盐314300

出  处:《电工技术》2021年第17期162-163,167,共3页Electric Engineering

摘  要:秦二厂#2机组棒电源发电机已连续运行近16年,在最近一次解体检修时,测量发现发电机滑环外径接近最小要求尺寸,需对滑环整体进行更换处理。因为滑环和转轴固定方式特殊,且新滑环没有螺纹孔,所以设计出一种专用工具,以安全有效地对滑环实施更换,并提高了新滑环安装的准确性。The CRDM power supply system generator in No.2 unit of Qinshan No.2 Nuclear Power Plant has been in continuous operation for nearly 16 years.In the last overhaul,it is found that the outer diameter of generator slip ring is close to the minimum required size,so it is necessary to replace the whole slip ring.Because the slip ring and the rotating shaft are fixed in a special way,and the new slip ring has no threaded holes,a special tool is designed to safely and effectively replace the slip ring and improve the accuracy of the installation of the new slip ring.

关 键 词:棒电源 滑环 更换 

分 类 号:TM623[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象