检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘继武 韩恺 闫炜炀 LIU Jiwu;HAN Kai;YAN Weiyang(Economic and Technical Research Institute of State Grid Shanxi Electric Power Company,Taiyuan,Shanxi 030021,China)
机构地区:[1]国网山西省电力公司经济技术研究院,山西太原030021
出 处:《山西电力》2021年第5期23-26,共4页Shanxi Electric Power
摘 要:山西采动影响区已达到全省国土面积的1/8,随着电网建设的快速发展,输电线路途经采动影响区已不可避免,分析山西省输变电线路途经采动影响区的水土流失特点并采取相应的防治措施具有重大的实用价值。通过分析铁塔基础的施工工艺、水土流失特征、主要影响因素等,提出了途经采动影响区输电铁塔建设减少水土流失的措施,对山西电网的绿色发展具有一定的借鉴意义。Since the mining-affected area of Shanxi Province has reached 1/8 of the total land area of the whole province,with the rapid development of power grid construction,it is inevitable that the transmission lines pass through the mining-affected area.And it is of great practical value to analyze the characteristics of water and soil erosion in the mining-affected area that transformation lines pass through in Shanxi Province and take corresponding control measures.Based on an analysis of tower foundation construction technology,water and soil erosion characteristics,main influencing factors and other aspects,measures are put forward to reduce water and soil erosion of the transmission tower construction in mining-affected area that the transmission lines pass through,which has certain reference significance for the green development of Shanxi power grid.
关 键 词:采动影响区 输电线路 水土流失 水土保持 防治措施
分 类 号:TM71[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117