检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡国勇 叶丽莎 薛少强 HU Guoyong;YE Lisha;XUE Shaoqiang(Power China Hubei Electric Engineering Co.,Ltd.,Wuhan Hubei 430040,China)
机构地区:[1]湖北省电力勘测设计院有限公司,湖北武汉430040
出 处:《湖北电力》2021年第4期71-78,共8页Hubei Electric Power
摘 要:针对1000 kV特高压钢管塔的直升机吊装方式,结合钢管塔的结构和直升机吊装工艺的实际需求,对杆塔分段、吊段处理、辅助措施方面进行了研究,并通过现场模拟试验,验证了杆塔分段、吊段设计方案的可行性。提出的杆塔吊段设计方案适用于多种钢管塔塔型,改动小但可操作性强,有利于钢管塔采用直升机吊装技术的推广。Aiming at the helicopter hoisting of 1000 kV UHV steel tubular tower,and combining with the structure of steel tubular tower and the practical requirement of helicopter hoisting technology,this paper makes a study on tower section,lifting section management and auxiliary measures,and then verifies the feasibility of the design scheme of tower section and hoisting section through field simulation test.The proposed design scheme of tower hoisting section can be applied to a variety of steel tubular tower types,with small changes but good operability,which is conducive to the popularization of helicopter hoisting technology for steel tubular tower.
分 类 号:TM7[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.118.99.234