检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:彭勇 PENG Yong(China Nerin Engineering Co.,Ltd.,Nanchang,Jiangxi 330038,China)
机构地区:[1]中国瑞林工程技术股份有限公司,江西南昌330038
出 处:《有色冶金设计与研究》2021年第5期52-54,共3页Nonferrous Metals Engineering & Research
摘 要:技改项目与新建工程项目相比存在一定的复杂性和多变性,投资估算编制的难度随之增加。结合某铜冶炼厂改造项目,针对技改项目中特有的拆除工程、利旧工程以及施工过程中的一些特殊措施进行投资估算,总结了技改项目投资估算编制的特点及要求。Compared with new construction projects,technical transformation projects have certain complexity and variability,which increases the difficulty of investment estimation.Combined with the reconstruction project of a copper smelter,the investment estimation is carried out for the unique demolition works,old projects and some special measures in the construction process of the technical transformation project,and the characteristics and requirements of the preparation of the investment estimation of the technical transformation project are summarized.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3