检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴杨[1] 刘再涛 王栋毅 彭康[3] WU Yang;LIU Zai-tao;WANG Dong-yi;PENG Kang(School of Resources and Safety Engineering,Chongqing University,Chongqing 400044,China;Sanshandao Gold Mine of Shandong Gold Mining Co Ltd,Laizhou 261442,Shandong,China;School of Resources and Safety Engineering,Central South University,Changsha 410083,Hunan,China)
机构地区:[1]重庆大学资源与安全学院,重庆400044 [2]山东黄金矿业有限公司三山岛金矿,山东莱州261442 [3]中南大学资源与安全工程学院,湖南长沙410083
出 处:《矿冶工程》2021年第5期14-17,共4页Mining and Metallurgical Engineering
基 金:国家自然科学基金(51974043,51774058);重庆市科技计划项目基础科学与前沿技术研究专项(cstc2018jcyjA3320)。
摘 要:针对三山岛金矿西山分矿某破碎矿段矿体难开采、原有上向水平进路充填法支护工程量大、作业循环周期长等问题,拟采用下向进路(进路宽3.6 m、高3.0 m)充填采矿法回采该段破碎矿体。通过安全系数法计算出承载层所需C30混凝土或尾砂胶结体厚度,对下向构筑工艺及施工步骤进行了介绍,并在试验采场进行了现场应用。结果表明,下向进路充填采矿法不但减轻了支护成本和支护工作量,同时保障了破碎矿体回采过程中的施工安全性,为破碎矿体安全高效开采积累了宝贵经验。In view of the problems in Xishan Branch of Sanshandao Gold Mine,including difficult mining of the broken orebody,a large amount of supporting work required and the long operation cycles in the previous overhand cut-and-fill mining method,it is proposed to adopt a underhand cut-and-fill mining(with an access road 3.6 m wide and 3.0 m high)to stope those broken orebody.The thickness of C30 concrete or tailings cement required for the bearing layer was calculated with the safety factor method and the downward operation techniques and the steps were introduced in detail.Based on the practical application of this method in the tested stope,it is shown that this underhand cut-and-fill mining method can not only reduce the cost and workload of the support,but also guarantee the operation safety in the process of mining broken orebodies,which can accumulate some valuable experience for the safe and efficient mining of broken ore bodies.
分 类 号:TD853[矿业工程—金属矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145