检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨孝新 董蒙蒙 张传伟 沈建明 田涯 刘福明 朱晓寒 YANG Xiaoxin;DONG Mengmeng;ZHANG Chuanwei;SHEN Jianming;TIAN Ya;LIU Fuming;ZHU Xiaohan(School of Mines,China University of Mining and Technology,Xuzhou 221116,China;South Open-pit Mine,Xinjiang Tianchi Energy Sources Co.,Ltd.,Changji 831100,China)
机构地区:[1]中国矿业大学矿业工程学院,江苏徐州221116 [2]新疆天池能源有限责任公司南露天煤矿,新疆昌吉831100
出 处:《煤矿安全》2021年第10期245-251,共7页Safety in Coal Mines
基 金:国家自然科学基金面上资助项目(51574222)。
摘 要:为了探究新疆南露天煤矿内排压脚过程中南帮稳定性变化规律,通过数值模拟结合理论分析手段,对南帮内排压脚过程中边坡稳定性动态变化规律进行了研究;利用FLAC3D强度折减法对南帮内排压脚过程进行了数值模拟分析,得到了内排压脚过程中南帮潜在滑动面位置及稳定性系数的变化规律,确定了南露天矿南帮内排压脚物料截面最优几何参数;基于数值模拟结果建立了南帮内排压脚的极限平衡理论模型,推导出内排压脚过程南帮稳定性系数的计算公式,阐述了南帮内排压脚过程中坡体应力演化规律,揭示了这一过程中南帮潜在滑移面位置变化及稳定性提高的机理。In order to explore the stability change law of the south slope during the process of the inner dumping pressure foot in the south open pit coal mine in Xinjiang, this paper studied the dynamic change law of the slope stability during the process of the inner dumping pressure foot in the south open pit coal mine by means of numerical simulation and theoretical analysis. Firstly,the FLAC3 Dstrength reduction method was used to simulate the process of the inner dumping pressure foot in the south slope, and the variation rule of the potential sliding surface position and stability coefficient in the process of the inner dumping pressure foot in the south slope was obtained. The optimal geometrical parameters of material cross section in the south side of the southern open-pit mine are obtained. Based on the numerical simulation results, the limit equilibrium theoretical model of the inner dumping pressure foot in the south slope was established, and the calculation formula of the stability coefficient of the middle south wall in the process of the inner dumping pressure foot was deduced. The evolution law of slope stress in the process of pressing foot in the south slope is expounded and the mechanism of the change of the position of the potential slip surface and the improvement of the stability of the middle south wall in the process of the inner dumping pressure foot was expounded.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229