交错式超前支护装置在综掘巷道中的应用  被引量:3

Application of Staggered Advanced Supporting Device in Fully-mechanized Roadway

在线阅读下载全文

作  者:韩光华 徐旷 Han Guanghua;Xu Kuang(CTCI International Engineering Co.,Ltd.,Nanchang,Jiangxi 330096)

机构地区:[1]中鼎国际工程有限责任公司西北分公司,江西南昌330096 [2]中鼎国际工程有限责任公司,江西南昌330096

出  处:《江西煤炭科技》2021年第4期42-43,共2页Jiangxi Coal Science & Technology

摘  要:结合黄陵一号煤矿1005回风顺槽现场地质条件,煤巷综掘工作面使用交错式超前支护装置作为临时支护方式代替传统的吊环前探梁和机载前探梁,扩大临时支护覆盖范围,有效的控制顶板,优化施工工艺,更大程度发挥了综掘机的掘进效率,进一步提升掘进装备水平。In view of the on-site geological conditions of 1005 ventilation crossheading in Huangling No.1 Colliery,the paper presents the application of staggered advanced supporting device as a temporary support means instead of traditional rings and airborne ahead of the ground beam at fully-mechanized working face to enlarging the coverage of temporary support,controlling the roof effectively,optimizing construction technology,which can enhance the level of excavating equipment by increasing the tunneling efficiency of roadheader.

关 键 词:煤巷综掘 交错式超前支护装置 自动铺网 安全高效 

分 类 号:TD353[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象