检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李臣武 Li Chenwu(School of Architecture and Engineering,Guizhou Vocational and Technical College,Guizhou,Guiyang 550023)
机构地区:[1]贵州职业技术学院建筑工程学院,贵州贵阳550023
出 处:《江西煤炭科技》2021年第4期162-165,共4页Jiangxi Coal Science & Technology
摘 要:为有效解决突出矿井原始应力区松软煤层煤巷条带区域预抽问题,以金佳煤矿佳一采区22#煤层132204运输巷为研究对象,采用定向长钻孔条带预抽瓦斯技术进行消突试验,钻孔设计时将主孔平孔部分布置在岩性坚硬的煤层底板岩层中,软煤钻孔施工时采用匀速运转、缓慢钻进等措施,提高钻孔的成孔率,钻孔采用高负压抽采,经抽采后进行措施效果检验,实现抽采达标,取得良好的抽采效果。In order to effectively solve the problem of pre-drainage in the strip area of soft coal seam in the original stress area of outburst mine,taking 22#coal seam,132204 transport roadway,Jiayi mining area of Jinjia Colliery as the research object,the outburst elimination test is carried out by directional long drilling strip pre-drainage technology.The flat hole part of the main hole is arranged in the rock hard coal seam floor rock layer during drilling design,and the drilling rate is improved by uniform speed operation and slow drilling during soft coal drilling construction,which achieves drainage up to the standard and obtains good drainage results.
分 类 号:TD712.62[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.148.107.92