矿井采煤工艺关键环节技术探究  被引量:1

Research on key link technology of mine coal mining technology

在线阅读下载全文

作  者:王凤潇 WANG Fengxiao(Sitai Coal Mine of Jinneng Holding Coal Industry Group Co.,Ltd.,Datong Shanxi 037003,China)

机构地区:[1]晋能控股煤业集团四台矿,山西大同037003

出  处:《山西化工》2021年第5期156-158,共3页Shanxi Chemical Industry

摘  要:为了提高原煤的块煤率,提高开采效率,通过分析某矿9号煤层的地质概况以及开采开拓方式,确定采煤工艺的关键环节,采用俯伪斜长壁式开采方法,在回采过程中,采用单体液压支架和木顶梁联合支护的方式对工作面进行支护,采用全部垮落法对工作面的顶板进行控制,以确保采煤作业的连续,提高块煤率,为企业创造经济效益。In order to improve the lump coal rate of raw coal and mining efficiency, by analyzing the geological situation and mining development mode of coal seam 9 in a mine, the key links of mining technology are determined. The downward pseudo inclined long wall mining method is adopted. In the mining process, the working face is supported by the combined support of single hydraulic support and wooden roof beam. The full caving method is used to control the roof of the working face, so as to ensure the continuity of mining operation, improve the lump coal rate and create economic benefits for the enterprise.

关 键 词:块煤率 开采开拓 关键环节 俯伪斜长壁 

分 类 号:TD82[矿业工程—煤矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象