检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王凤潇 WANG Fengxiao(Sitai Coal Mine of Jinneng Holding Coal Industry Group Co.,Ltd.,Datong Shanxi 037003,China)
机构地区:[1]晋能控股煤业集团四台矿,山西大同037003
出 处:《山西化工》2021年第5期156-158,共3页Shanxi Chemical Industry
摘 要:为了提高原煤的块煤率,提高开采效率,通过分析某矿9号煤层的地质概况以及开采开拓方式,确定采煤工艺的关键环节,采用俯伪斜长壁式开采方法,在回采过程中,采用单体液压支架和木顶梁联合支护的方式对工作面进行支护,采用全部垮落法对工作面的顶板进行控制,以确保采煤作业的连续,提高块煤率,为企业创造经济效益。In order to improve the lump coal rate of raw coal and mining efficiency, by analyzing the geological situation and mining development mode of coal seam 9 in a mine, the key links of mining technology are determined. The downward pseudo inclined long wall mining method is adopted. In the mining process, the working face is supported by the combined support of single hydraulic support and wooden roof beam. The full caving method is used to control the roof of the working face, so as to ensure the continuity of mining operation, improve the lump coal rate and create economic benefits for the enterprise.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.118.155.106