检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘平[1] 任宁[1] LIU Ping;REN Ning(Hunan Lishui Hydro & Power Co. , Ltd. , Changsha 410004, China)
机构地区:[1]湖南澧水流域水利水电开发有限责任公司,湖南长沙410004
出 处:《中国水能及电气化》2021年第10期68-70,共3页China Water Power & Electrification
摘 要:移民安置专项验收是水利水电工程竣工验收前的关键环节。文章结合皂市水利枢纽工程竣工移民安置验收工作的实践,以移民安置验收条件所包括的移民安置、库底清理、财务决算和审计、档案管理、遗留问题处理等为主线,阐述和总结了验收工作的几点做法和体会,以供移民安置验收工作参考。The special acceptance of resettlement is the key link before the completion acceptance of water resources and hydropower engineering.ZaoshiWater Control Project completion resettlement acceptance work practice is combined in the paper.Several practices and experience of the acceptance work are described and summarized with the resettlement acceptance conditions as the main line,including resettlement,reservoir bottom cleaning,financial statements and audit,file management,leftover problem settlement,etc.,thereby providing reference for resettlement acceptance work.
分 类 号:TV61[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.174