浅谈旋流池分部分项工程的施工方法  被引量:2

A Discussion on the Construction Method of Each Subdivisional Project of Swirl Tank

在线阅读下载全文

作  者:陈志剑[1,2] CHEN Zhijian(CISDI Engineering and Technology Co.Ltd,Chongqing 400013,China;Chongqing Municipal Wastewater Treatment Res.&Eng.Center,Chongqing 400045,China)

机构地区:[1]中冶赛迪工程技术股份有限公司,重庆400013 [2]重庆市城镇污水处理工程技术研究中心,重庆400045

出  处:《冶金动力》2021年第5期67-69,72,共4页Metallurgical Power

摘  要:现代大型钢铁联合企业的热轧工程和连铸工程的旋流池,因其规模较大、施工难度增大。重点论述了两种施工方法(沉井法和逆做法)以及关键的施工工序(沉井,封底,降水,护壁),提出了几点注意事项(纠偏,监测,应急预案)。The whirlpool of hot rolling project and continuous casting project in mod ern large-scale steel complex is more difficult to construct because of its large scale.This paper focuses on two construction methods(open caisson method and reverse method)and key construction processes(open caisson,bottom sealing,dewatering and wall protection),and puts forward some precautions(deviation correction,monitoring and emergency plan).

关 键 词:旋流池 施工方法 沉井法 逆做法 

分 类 号:TU723[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象