铁斯巴汗水库除险加固工程径流计算研究  被引量:3

Study on Runoff Calculation of Tiesparhan Reservoir Reinforcement Project Measurement

在线阅读下载全文

作  者:何潇 He Xiao(Tacheng Area Water Conservancy and Hydropower Survey and Design Institute,Tacheng 834700,Xinjiang)

机构地区:[1]塔城地区水利水电勘察设计院,新疆塔城834700

出  处:《陕西水利》2021年第11期46-47,50,共3页Shaanxi Water Resources

摘  要:为了获取铁斯巴汗水库径流量,为水库除险加固工程提供参考,采用水文比拟法、等值线图法2种方法进行计算。采用等值线图法获取了不同频率下的径流量,通过合理性分析,采用等值线图法获取的计算结果较为可靠,作为径流计算推荐方法。In order to obtain the runoff of the Tisbahan Reservoir,it provides a reference for the reinforcement project of the reservoir.Two methods,hydrological comparison method and contour map method are used for calculation.The contour map method is used to obtain the runoff volume at different frequencies.Through rational analysis,the calculation result obtained by the contour map method is more reliable,and it is the recommended method for runoff calculation.

关 键 词:水库 径流 水文比拟 等值线图 合理性分析 

分 类 号:TV698[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象