检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王建党 王非洲 WANG Jiandang;WANG Feizhou(Guizhou Bridge Construction Group Co.,Ltd.,Guiyang,Guizhou 550001,China)
机构地区:[1]贵州桥梁建设集团有限公司,贵州贵阳550001
出 处:《建筑施工》2021年第10期2090-2092,共3页Building Construction
摘 要:为杜绝造浪房真空舱渗水漏气现象发生,通过设置合理施工工序,采用特制止水螺杆措施,有效地将真空舱斜板上、下的模板支撑体系连成一体,减少了施工缝的设置数量,避免了施工质量隐患,取得了优良的施工质量。在分享施工经验的基础上,分析并总结了真空舱施工工艺控制要点,针对施工不足之处,提出后续改进、提升之处,为有效提升造浪房真空舱施工质量和施工效率提供借鉴。To prevent the occurrence of water seepage and air leakage in the vacuum chamber of the wave making room,by setting reasonable construction procedures and adopting special water stop screw,the formwork support system above and below the inclined plate of the vacuum chamber is effectively connected together,the number of construction joints is reduced,the hidden dangers of construction quality are avoided,and the excellent construction quality is achieved.On the basis of sharing construction experience,the key points of vacuum chamber construction process control are analyzed and summarized.Aiming at the shortcomings of the construction,the follow-up improvements and enhancements are proposed so as to provide a reference for effectively improving the construction quality and efficiency of the vacuum chamber of the wave making room.
分 类 号:TU755[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.134.81.178