检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵浩 ZHAO Hao(Shandong Energy Feicheng Mining Group,Heze 274300,China)
出 处:《煤矿现代化》2021年第6期15-18,共4页Coal Mine Modernization
摘 要:肥城矿业集团陈蛮庄煤矿3800轨道下山是八采区主要开拓运输巷道,巷道围岩以粉砂岩、泥岩为主,岩层倾角平均23°,受围岩弱面结构、高泥质围岩特性等因素影响,巷道在掘进过程中出现持续性变形现象。针对此问题,通过对3800轨道下山围岩力学性质分析,进一步合理了支护形式及支护参数,取得了较好的支护效果。The 3800 track downhill of Chenmanzhuang Coal Mine of Feicheng Mining Group is the main development and transportation roadway in the eighth mining area.The surrounding rock of the roadway is mainly siltstone and mudstone,and the dip angle of the rock stratum is 23°on average.Affected by the weak surface structure of the surrounding rock and the characteristics of high argillaceous surrounding rock,the continuous deformation of the roadway occurs in the tunneling process.In view of this problem,through the analysis of the mechanical properties of the surrounding rock of the 3800 track,the support form and support parameters are further reasonable,and good support effect is achieved.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.128.247.220