检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:秦阳 QIN Yang(Geological Survey Department of Hulonggou Coal Company,Jinneng Holding Coal Industry Group,Shuozhou 038300,China)
机构地区:[1]晋能控股煤业集团虎龙沟煤业公司地测科,山西朔州038300
出 处:《煤矿现代化》2021年第6期187-188,191,共3页Coal Mine Modernization
摘 要:为估算煤炭资源储量,传统的三维泰森串行算法已不能满足要求,以虎龙沟矿为基础,提出三维泰森并行优化算法构建体矿模型,通过不同规模的三维数据,对串行算法和并行算法进行对比分析,验证并行算法的可行性,最后在虎龙沟矿上进行验证,以原始钻孔数据品味属性作为已知数据,采用插值并行算法,估算出煤炭资源储量为21973万t,与实际储量更贴近,算法运算时间也较快,为准确快速估算储量提供了解决办法。In order to estimate the reserves of coal resources,the traditional 3D Tyson serial algorithm can no longer meet the requirements.Based on the Hulonggou mine,a 3D Tyson parallel optimization algorithm is proposed to construct a volume mine model.The parallel algorithm was compared and analyzed to verify the feasibility of the parallel algorithm.Finally,it was verified on the Hulonggou Mine.Using the original drilling data taste attribute as the known data,using the interpolation parallel algorithm,the coal resource reserve was estimated to be 21973 Ten thousand tons,which is closer to the actual reserves,and the calculation time of the algorithm is faster,which provides a solution for accurately and quickly estimating reserves.
分 类 号:P624[天文地球—地质矿产勘探]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.117.71.244