作 者:雷维岳 范春艳 丁俊 LEI Weiyue;FAN Chunyan;DING Jun(Sinohydro Bureau 10 Co., LTD, Dujiangyan, Sichuan,611830)
机构地区:[1]中国水利水电第十工程局有限公司,四川成都611830
出 处:《四川水力发电》2021年第5期49-52,共4页Sichuan Hydropower
摘 要:四川某水电站高速导流放空洞全长894.24 m,设计要求的衬砌混凝土为C40F300W6。原设计的硅粉抗冲耐磨混凝土存在表面易干缩龟裂、施工难度大等缺点。经多方讨论和论证,最终将其更换为HF抗冲耐磨混凝土,即在混凝土中加入适量的HF外加剂,有效地改善了混凝土拌合物的性能,提高了混凝土的抗冲耐磨性能,并具有水泥用量低、易于施工等特点,取得了较好的效果。The length of the high-speed diversion flood discharge vent of one hydropower station in Sichuan is 894.24 m and the designed lining concrete is C40F300W6.The original design of silica abrasion-resistant concrete has some shortcomings,such as surface shrinkage cracking,difficult in construction and so on.After rounds of discussion and demonstration,HF abrasion-resistant concrete is introduced to replace the original design by adding HF additives,which effectively improves the performance of the concrete mixture and its abrasion-resistant performance.HF abrasion-resistant concrete has the characteristics of low consumption of cement,easy construction and so on.Good results are achieved applying HF abrasion-resistant concrete.
分 类 号:TV7[水利工程—水利水电工程] TV544
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7