巴塘水电站河床截流设计  被引量:2

Design of River Bed Closure of Batang Hydropower Station

在线阅读下载全文

作  者:廖有林 杜晓凡 陈志刚 LIAO Youlin;DU Xiaofan;CHEN Zhigang(Batang Branch of Huadian Jinsha River Upstream Hydropower Development Co., LTD, Chengdu, Sichuan, 610041)

机构地区:[1]华电金沙江上游水电开发有限公司巴塘分公司,四川成都610041

出  处:《四川水力发电》2021年第5期133-135,140,共4页Sichuan Hydropower

摘  要:巴塘水电站地处于高山峡谷地区,可利用的施工场地有限,具有截流运输难度大、边界条件复杂、抛投强度高等特点,通过对截流总体规划设计和科学合理的组织管理,成功实现了该水电站截流目标任务。为后续相关水电站建设积累了宝贵经验,可为以后类似工程提供参考。Batang Hydropower Station is located in high mountain and canyon area with limited construction site,and the closure of river has the characteristics of difficulty in transportation,complicated boundary conditions,and high intensity of throwing and dropping.Through overall planning and design of closure and scientific and reasonable organization and management,the closure target of the hydropower station has been successfully achieved.It has accumulated valuable experience for the subsequent construction of related hydropower stations and can provide reference for similar projects in the future.

关 键 词:巴塘水电站 截流规划 截流措施 截流备料 

分 类 号:TM622[电气工程—电力系统及自动化] TV551.2[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象