检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:谢先坤 XIE Xian-kun(Shanghai Water Conservancy Engineering Design&Research Institute,Shanghai Beach and Coastal Engineering Technology Research Center,Shanghai 200061,China)
机构地区:[1]上海市水利工程设计研究院有限公司,上海滩涂海岸工程技术研究中心,上海200061
出 处:《水运工程》2021年第11期8-12,共5页Port & Waterway Engineering
摘 要:针对人工岛四周砂质堤透水性强、内河水位受外海潮位影响显著的问题,为避免人工引排须选定合理的人工岛内河常水位。通过建立非稳定渗流模型,研究渗流场与渗流量随潮位变化的关系。选取近海典型潮位,采用分段求和法计算在一个潮汐周期内各种拟定的内河水位的净渗流量。对应净渗流量为零的内河水位即为最佳河道常水位,该水位为确定内河河道规模及岛内吹填地面高程提供了基础。Aiming at the strong permeability of sandy embankment around the artificial island and the obvious influence of sea tide level on the water level of the inner river,a reasonable water level of the inner river on the artificial island should be selected to avoid artificial drainage.Through the establishment of unsteady seepage model,the relationship between seepage field and seepage flow changes with tidal level is studied.The typical tide level of the offshore sea is selected,and the net seepage discharge of various proposed inland river levels within a tidal cycle is calculated by subsection summation method.The water level corresponding to zero net seepage discharge is the optimal normal water level of the river channel,which provides a basis for determination of the scale of the inland river channel and the elevation of dredging ground in the island.
关 键 词:潮汐 人工岛 常水位 非稳定渗流 渗流量 分段求和法
分 类 号:U656.3[交通运输工程—港口、海岸及近海工程] P731.22[交通运输工程—船舶与海洋工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.140.197.130