检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王云飞 石进 李世健 汤宇 WANG Yun-fei;SHI Jin;LI Shi-jian;TANG Yu(CCCC Second Harbor Consultants Co.,Ltd.,Wuhan 430071,China;Changjiang Estuary Waterway Bureau,Ministry of Transport,Shanghai 200003,China)
机构地区:[1]中交第二航务工程勘察设计院有限公司,湖北武汉430071 [2]交通运输部长江口航道局,上海200003
出 处:《水运工程》2021年第11期87-92,共6页Port & Waterway Engineering
基 金:上海市自然基金面上项目(20ZR1416900)。
摘 要:为探究南槽航道治理一期工程对长江口九段沙湿地生态变化的影响,于2017、2019、2020年对九段沙湿地附近水域的非生物因子和生物因子进行调查。通过对比施工前后九段沙湿地区域水动力条件、水质、沉积物的监测数据,研究工程对非生物环境的影响,并采用生物多样性分析、遥感解译等手段分析工程对生物因子的影响。结果表明,区域水动力条件、水质和沉积物因子在施工前后存在一定波动,但无显著变化;浮游、底栖生物多样性有所增加,植被面积呈逐年扩增趋势,说明南槽航道一期工程的实施不会对九段沙湿地生态现状产生显著的不利影响,且对湿地多样性的增加起到一定的积极作用。In order to explore the impact of the Nancao channel regulation phase I project on the ecological change of Jiuduansha wetland in the Yangtze Estuary,we investigate the abiotic and biological factors in the waters near the wetland in 2017,2019,2020,compare the monitoring data of hydrodynamic conditions,water quality and sediments in the wetland before and after the construction,analyze the impact of the project on the abiotic environment,use the biodiversity analysis,remote sensing interpretation and other methods to analyze the impact of project on the biological factors.The results show that the regional hydrodynamic conditions,water quality and sediment factors fluctuate before and after construction,but there is no significant change.The diversity of planktonic and benthic organisms increase,and the vegetation area expands year by year,the implementation of Nancao channel phase I project does not have a significant adverse impact on the ecological status of Jiuduansha wetland,and the project also plays a positive role in the increase of wetland diversity.
分 类 号:U612[交通运输工程—船舶及航道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30