检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:高展 Gao Zhan(Chengde Heishan Iron Mine of HBIS Group Mining Co., Ltd., Chengde 067000, Hebei)
机构地区:[1]河钢集团矿业有限公司承德黑山铁矿,河北承德067000
出 处:《河北冶金》2021年第10期46-49,79,共5页Hebei Metallurgy
摘 要:针对黑山铁矿露天转地下无底柱分段崩落法开采中存在矿石损失贫化率大,与大块矿产出率高等问题,进行了系统优化研究。通过回采工艺优化,将原“等间距”进路菱形布置方式改为“半矿半岩”与近矿围岩结合的布置方式,确定了最优崩矿排距值,有效降低了矿石损失贫化率;通过中深孔布孔方式优化,提出了进路中深孔采用“三凿岩中心”、切割井采用“双凿岩中心”取代原“单凿岩中心”的优化方法,有效降低了大块矿产出率,并保护了眉线,节约中深孔凿岩成本约47万元/年,经济效益显著。Aiming at the large ore loss and dilution and high yield rate of large blocks in the mining of Heishan Iron Mine from open-pit to underground sublevel caving method without pillars,a system optimization study was carried out.Through the optimization of mining process,the original diamond layout of"equal spacing"route is changed to the combination layout of"half mine and half rock"and near mine surrounding rock,and the optimal caving row spacing value is determined,which effectively reduces the ore loss and dilution rate.Through the optimization of medium and deep holes layout,it is proposed that the"three rock drilling centers"are adopted for the medium and deep holes in the route,and the"dual rock drilling centers"are used to replace the original"single rock drilling centers"in the cutting shaft,which effectively reduces the yield rate of large blocks and protects the eyebrow line.It saves about 0.47 million RMB per year in the cost of medium and deep holes drilling with significant economic benefit.
关 键 词:无底柱分段崩落法 回采 崩矿排距 布孔方式 损失贫化率
分 类 号:TD853.31[矿业工程—金属矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.46