检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张译心 郝敏[2] 方晴 陆宝宏[1] 王剑 裴颖 ZHANG Yi-xin;HAO Min;FANG Qing;LU Bao-hong;WANG Jian;PEI Ying(College of Hydrology and Water Resources,Hohai University,Nanjing 210098,China;Beijing Institute of Water,Beijing 100048,China;Yellow River Hydrological and Water Resources Research Institute,Zhengzhou 450004,China)
机构地区:[1]河海大学水文水资源学院,南京210098 [2]北京市水利规划设计研究院,北京100048 [3]黄河水文水资源科学研究院,郑州450004
出 处:《中国农村水利水电》2021年第11期90-96,102,共8页China Rural Water and Hydropower
基 金:国家重点研发计划(2018YFC1508200)。
摘 要:为有效应对城区暴雨洪涝灾害,基于MIKE FLOOD平台,将MIKE11、MIKE21和MIKE URBAN模型耦合,构建了城区内涝耦合模型。选取新建城区东山湖产业园进行模拟。由于产业园新区无实测水文资料,采用管道流量自检验法验证了所构建的模型的合理性,模拟结果与实际情况较吻合。结果表明,在遭遇强降水时,区内出现多个溢流点,道路出现不同程度积水,部分管道处于有压流状态,检查井也多数发生溢流,无法满足排水需求。针对园区防洪排涝存在的问题,提出内涝防治方案,以MIKE FLOOD为基础,实现低影响开发(Low Impact Development,LID)措施组合布设。措施实施后,园区内地表淹没面积减少,积水深度普遍降低,积水点出现积水的时间推迟且积水总历时减小,管道排水口流量峰值明显减小,排水流量峰值的出现延迟。研究为园区防灾减灾工作提供技术支撑,也为类似城区的建设提供参考。To effectively deal with the rainstorm and flood disaster in urban areas,a waterlogging model of flood control and drainage is built based on MIKE FLOOD platform,coupling MIKE11,MIKE21 and Mike Urban.Dongshan Lake Industrial Park,a newly built urban area,is selected for simulation.Since there is no survey hydrological data in the park,pipeline flow self-test method is used to analyze the rationality of the simulation results.The results show that the simulation results are in good agreement with the actual situation.According to the simulation results of the model,when there is heavy rainfall,there are multiple overflow points in the study area.The roads in the area also have waterlogging by different degrees,some of pipelines are in a state of pressure flow and many inspection wells overflow,resulting in overloading and inability to meet drainage requirements.Aiming at the problems existing in the park,the waterlogging prevention and control scheme is put forward.Based on Mike Flood,simulation is carried out under the combination layout of low-impact development(LID)measures.After the implementation of the measures,the surface inundation area of the study area is reduced,the depth of ponding is generally reduced,the time of ponding at each ponding point is delayed and the total duration of ponding is reduced;the peak flow at the pipe outlet is significantly reduced,and the peak flow of drainage is delayed.This study provides technical support for disaster prevention in the park and serves as a reference for the construction of similar urban areas.
关 键 词:城市内涝 MIKE FLOOD 低影响开发 一维洪水演进 地表漫流 排水管网
分 类 号:TV122[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.42