海洋平台清管设备布置及管道设计  被引量:1

Pigging equipment layout and pipeline design of offshore platform

在线阅读下载全文

作  者:陈颖[1] Chen Ying(Offshore Petroleum Engineering Co.,LTD.,Tianjin 300450)

机构地区:[1]海洋石油工程股份有限公司,天津300450

出  处:《石化技术》2021年第10期69-70,共2页Petrochemical Industry Technology

摘  要:通常情况下海洋石油公司的海底管线无法进行定期清理,其中存在较多的沉积物,在进行清管作业的过程中存在很大的风险以及难度,如果较长时间不展开清管作业,则可能导致管线内部杂质堆积,增加管线卡堵的风险。作为海洋石油平台建设的重点内容之一,平台清管设备的布置以及管道的设计意义重大,因而需要做好科学的统筹安排。Normally seabed pipeline offshore oil company could not be cleaned regularly,there are more deposits,in the process of pigging operations there is a big risk and difficult,if not spread pigging operation for a long time,may lead to the accumulation of all impurities inside the pipeline,lead to increased risk of pipeline card,As one of the key contents of offshore oil platform construction,the layout of platform pigging equipment and pipeline design are of great significance,so it is necessary to make a scientific overall arrangement.

关 键 词:海洋平台 清管设备 布置 管道设计 

分 类 号:TE953[石油与天然气工程—石油机械设备]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象