港珠澳大桥江海直达船航道桥钢箱梁安装方案研究  被引量:21

Study of Installation Schemes for Sea-River Ship Channel Bridge of Hong Kong-Zhuhai-Macao Bridge

在线阅读下载全文

作  者:金秀男[1] 朴泷[2] 陈黎 赵建 JIN Xiu-nan;PIAO Long;CHEN Li;ZHAO Jian(CCCC Highway Consultants Co. , Ltd. , Beijing 100088, China;School of Civil Engineering and Transportation, South China University of Technology, Guangzhou 510640, China;Wuhan Bridge and Building Works Supervision Co. , Ltd. , Wuhan 430034, China)

机构地区:[1]中交公路规划设计院有限公司,北京100088 [2]华南理工大学土木与交通学院,广东广州510640 [3]武汉桥梁建筑工程监理有限公司,湖北武汉430034

出  处:《世界桥梁》2021年第6期21-27,共7页World Bridges

摘  要:港珠澳大桥江海直达船航道桥为主跨258 m的三塔中央索面钢箱梁斜拉桥,桥位处热带气旋登陆频繁且可能面临台风干扰,为选取合适的钢箱梁安装方案,从结构成桥目标状态、钢箱梁制造线形、施工可行性和施工工效等方面对悬臂拼装方案和“大节段安装+悬臂拼装”混合安装方案进行比选研究。结果表明:2种方案均能实现结构目标状态及钢箱梁制造线形,且差异较小;相比悬臂拼装方案,“大节段安装+悬臂拼装”混合安装方案可提高施工工效,有效规避并降低主体结构的渡台风险,因此选为钢箱梁安装方案。混合安装方案中,138号桥塔有索区钢箱梁采用大节段安装,139号和140号桥塔有索区钢箱梁采用悬臂拼装,采用该方案后,该桥桥面线形控制良好,全桥合龙提前实现。The Sea-River Ship Channel Bridge of Hong Kong-Zhuhai-Macao Bridge is a three-pylon steel box girder cable-stayed bridge with two main spans of 258 m.The single cable plane is anchored along the center of the deck.The bridge site is located in a tropical cyclone frequented area where construction work faces disruptions caused by typhoon.To find the proper installation scheme for the steel box girder,two schemes,including cantilever assembly and the combination of large-segment erection and cantilever assembly,were compared from aspects of target completion state,manufacturing geometry of steel box girder,constructability and construction efficiency.The results indicate that both the two schemes can ensure the realization of the target completion state and the manufacturing geometry of steel box girder,with a minor discrepancy.Compared to the cantilever assembly method,the combination of large-segment erection and cantilever assembly can improve the construction efficiency and effectively elude and reduce the damage risk of the main structure in typhoon,which is finally used.The steel box girders in the cable-stayed area of pylon No.138 were assembled from large segments,and the steel box girders in the cable-stayed areas of pylons No.139 and No.140 were assembled in cantilevers.The deck alignment of the bridge was under great control,and the closure of the full bridge was completed ahead of schedule.

关 键 词:斜拉桥 钢箱梁 大节段安装 悬臂拼装 混合安装 成桥状态 线形 施工技术 

分 类 号:U448.27[建筑科学—桥梁与隧道工程] U443.35[交通运输工程—道路与铁道工程]

 