作 者:周志伟 ZHOU Zhi-wei(Fujian Industrial Equipment Installation Co.,Ltd.,Fuzhou 350000,China)
机构地区:[1]福建省工业设备安装有限公司,福建福州350000
出 处:《化工管理》2021年第32期188-189,共2页Chemical Engineering Management
摘 要:随着电力行业的不断发展,我国逐渐加大了对PTA项目工程的施工力度,旨在提高PTA项目工程的施工质量和施工进度,而电缆补偿导线敷设、接线及仪表安装作为PTA项目工程重要施工内容,需要施工单位对其给予充分的重视,以提高PTA项目工程整体施工效率和效果,为进一步提高施工单位的社会效益和经济效益提供有力的保障。With the continuous development of electric power industry,China has gradually strengthened the construction of PTA project,aiming to improve the construction quality and progress of PTA project.With cable compensation wire laying,wiring and instrument installation as the important construction content of PTA project,the construction unit needs to pay full attention to the overall construction efficiency and effect of PTA project and provide a strong guarantee for further improving the social and economic benefits of the construction unit.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7