检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:鲍建腾 唐仁 刘涛 BAO Jianteng;TANG Ren;LIU Tao(Flood and Drought Disaster Prevention and Control Center of Jiangsu Province,Nanjing 210029,China;Jiangsu Taihu Planning and Design Institute of Water Resources Co.,Ltd.,Suzhou 215106,China;General Irrigation Canal Management Office of Jiangsu Province,Huai'an 223200,China)
机构地区:[1]江苏省水旱灾害防御调度指挥中心,江苏南京210029 [2]江苏省太湖水利规划设计研究院有限公司,江苏苏州215106 [3]江苏省灌溉总渠管理处,江苏淮安223200
出 处:《江苏水利》2021年第11期57-60,共4页Jiangsu Water Resources
摘 要:新孟河工程在防御台风“烟花”期间首次调度运用,行洪历时12 d,外排洪水5500万m^(3),有效提高了流域和区域的防洪排涝能力,减轻了太湖湖西地区以及大运河防洪压力,发挥了巨大防洪排涝效益。在总结新孟河工程调度运用的启用背景的基础上,深入进行了启用效益分析,并研究提出相关优化运用对策与建议。The Xinmeng River Project was first operated during the defense of typhoon'fireworks'.The flood lasted for 12 days and 55 million m^(3) of flood was discharged,which effectively improved the flood control and drainage capacity of the basin and region,reduced the flood control pressure in the west of Taihu Lake and the Grand Canal,and played a huge flood control and drainage benefit.On the basis of summarizing the background of the operation of the Xinmeng River Project,the benefit analysis of the operation was carried out in depth,and the relevant optimization countermeasures and suggestions were put forward.
分 类 号:TV851[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145