长距离引水隧洞底拱混凝土衬砌无轨滑模施工技术创新与应用  被引量:3

Construction Technology Innovation and Application of Railless Sliding Formworkfor Concrete Lining of Bottom Arch of Long Distance Water Diversion Tunnel

在线阅读下载全文

作  者:李忠贵 LI Zhonggui(China Huadian Engineering Co. , Ltd. , Beijing 100070, China)

机构地区:[1]中国华电科工集团有限公司,北京100070

出  处:《中国水能及电气化》2021年第11期50-54,共5页China Water Power & Electrification

摘  要:为解决阿萨汉一级水电站引水隧洞底拱混凝土衬砌技术难题,在实际工程建设中,设计制作了3套无轨滑模,不仅加快了工程进度、降低了施工成本,也较好地解决了隧洞底拱衬砌中常见的气泡麻面多的质量缺陷问题,可为其他类似长距离隧洞混凝土衬砌施工提供借鉴和参考。Three sets of raillesssliding formworksare designed and manufactured in the actual project construction in order to solve the technical problem of concrete lining for the bottom arch of the water diversion tunnel in Asahan No.1 Hydropower Station.It accelerates the project progress and reduces the construction cost on the one hand.It also solves the common quality defects of many bubble pockmarked in the tunnel bottom arch lining on the other hand.It can provide reference for other similar long distance tunnel concrete lining construction.

关 键 词:长距离 引水隧洞 混凝土衬砌 无轨滑模 

分 类 号:TV672.1[水利工程—水利水电工程]

 