检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨冲 Yang Chong(China Power Group Northeast Survey&Design Academy Co.,Ltd.,Hangzhou 311100,China)
机构地区:[1]中国电建集团华东勘测设计研究院有限公司,浙江杭州311100
出 处:《山西建筑》2021年第24期45-47,共3页Shanxi Architecture
摘 要:8A编组地下车站的车站规模相对于6B编组车站其长、宽、高都相对较大,地铁快线车站应层高加大引起站内公共区楼梯提升高度和平面长度增加,同时梯柱也相应增加,楼梯下方增设梯柱后占用站台层公共区面积,对站台层空间切割较为严重,影响站台空间通透,不利于站台乘客通行。针对此情况,有必要对快线地下车站公共区楼梯方案进行优化设计,提高车站空间利用率,力求达到功能合理,安全可靠,经济适用和技术先进的目的。The length,width and height of 8A marshalling underground station is greater than that of 6B marshalling underground station,with the public stair height and length increasing,the express station story is increasing and stair column is increasing too,which has severe impact upon the subway station space cutting,subway station space excavation and smooth transit as well.In light of the above mentioned conditions,it is necessary to carry out optimal design of the public staircase scheme of the city express,to improve the subway station space utilization ratio and to supply functional,safe,reliable,economic and advanced subway station staircase.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7