检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:蔡创开 CAI Chuangkai(ZiJin Mining Group Co.,Ltd.,Shanghang 364200,China)
机构地区:[1]紫金矿业集团股份有限公司,福建上杭364200
出 处:《湿法冶金》2021年第6期457-460,共4页Hydrometallurgy of China
摘 要:研究了用Fe_(2)(SO_(4))_(3)-H_(2)SO_(4)-O_(2)体系从某高铜金精矿中浸出铜,考察了各因素对铜浸出的影响。结果表明:在精矿粒度-38μm占97.2%、硫酸初始质量浓度100 g/L、Fe^(3+)质量浓度10 g/L、矿浆保温80℃条件下充氧气搅拌16 h,铜浸出率达97.82%,浸出渣中铜降至0.5%以下,浸出效果较好。Leaching of copper from a copper-bearing gold concentrate in Fe_(2)(SO_(4))_(3)-H_(2)SO_(4)-O_(2) system was studied.The results show that under the conditions of ore particle size of-38μm accounting for 97.2%,initial sulfuric acid mass concentration of 100 g/L,Fe^(3+)mass concentration of 10 g/L,pulp temperature of 80℃and stirring with oxygen for 16 h,the copper leaching rate reaches 97.82%,and the copper mass fraction in the leaching residue reduces to less than 0.5%.Copper is effectively leached.
分 类 号:TF803.21[冶金工程—有色金属冶金] TF811
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.58.216.183