检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张利滨 王伟 ZHANG Libin;WANG Wei(Henan Water Conservancy Survey CO.LTD.Zhengzhou 450008,China;Control Engineering Technology Institute of Special Geotechnical Environment of Henan,Zhengzhou 450008,China)
机构地区:[1]河南省水利勘测有限公司,河南郑州450008 [2]河南省特殊岩土环境控制工程技术中心,河南郑州450008
出 处:《河南水利与南水北调》2021年第9期59-61,共3页Henan Water Resources & South-to-North Water Diversion
摘 要:水泥土搅拌桩具有经济环保、施工方便、技术成熟等优势,广泛应用于水工建筑物地基处理。文章以水沟防洪闸为例,提出水泥土搅拌桩复合地基处理既要满足强度要求,又要避免"悬浮"桩型,减小处理后的地基沉降。水泥土搅拌桩设计时,首先应结合场区的地质条件,选择承载力较高的地层作为桩端持力层,确定有效桩长。然后根据确定的有效桩长,分别按照桩长范围内的侧阻力特征值、端阻力特征值和桩身强度分布计算单桩竖向承载力特征值,取二者较小值作为单桩竖向承载力特征值。最后根据采用的单桩竖向承载力特征值假定不同桩间距、不同布桩型式试算复合地基承载力,本着既能满足上部荷载要求,又尽量减少处理工程量的角度出发,选择桩间距1.25 m、梅花形布桩处理方案来进行地基处理。Cement-soil mixing pile is widely used in foundation treatment of hydraulic structures because of its economic and environmental protection,convenient construction and mature technology.Taking the flood gate of gully as an example,a treatment scheme of cement-soil mixing pile composite foundation is put forward in this paper,which should not only meet the strength requirements,but also avoid the suspended pile type,so as to reduce the settlement of the foundation after treatment.In the design of cement-soil mixing pile,the stratum with higher bearing capacity should be selected as the pile tip bearing layer and the effective pile length should be determined according to the geological conditions of the site.Then,according to the determined effective pile length,the characteristic values of side resistance,end resistance and pile strength distribution within the range of pile length,the characteristic value of vertical bearing capacity of single pile are calculated according to the characteristic values of lateral resistance,end resistance and pile strength distribution within the range of pile length respectively,and the smaller value is taken as the characteristic value of vertical bearing capacity of single pile.Finally,according to the characteristic value of vertical bearing capacity of single pile,the bearing capacity of composite foundation is calculated by assuming different pile spacing and pile arrangement types.From the perspective of meeting the upper load requirements and minimizing the amount of engineering work,the treatment scheme of plum pile with pile spacing of 1.25 m are selected for foundation treatment.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7