检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:井庆贺 张洪清 郝嘉伟 闫寿庆 JING Qinghe;ZHANG Hongqing;HAO Jiawei;YAN Shouqing(Zhalainuoer Coal Industry Co.,Ltd.,Manzhouli 021410,China;Department of Resources and Civil Engineering,Yantai Gold College,Yantai 265401,China;College of Energy and Mining Engineering,Shandong University of Science and Technology,Qingdao 266590,China)
机构地区:[1]扎赉诺尔煤业有限责任公司,内蒙古满洲里021410 [2]烟台黄金职业学院资源与土木工程系,山东烟台265401 [3]山东科技大学能源与矿业工程学院,山东青岛266590
出 处:《中国矿业》2021年第12期121-127,共7页China Mining Magazine
基 金:华能集团总部科技项目“特厚煤层顶分层大采高综采高效铺网洁净开采技术与装备研发项目”资助。
摘 要:以灵东煤矿软岩采空区下Ⅱ3煤层开采为背景,选取工作面长度、区段煤柱宽度、采高等3个因素进行正交试验设计,通过FLAC^(3D)数值软件模拟不同因素组合下工作面覆岩的破坏情况,分析每个因素对工作面覆岩破坏的影响程度。试验结果表明,各个因素对Ⅱ3煤层工作面顶板破坏高度影响显著性次序依次为:采高>工作面长度>区段煤柱宽度。根据对数值模拟结果的分析,结合各因素对导水裂缝带高度影响曲线,遵循煤矿安全高效生产的基本原则,确定Ⅱ3煤层工作面合理尺寸组合为工作面长度为250 m,区段煤柱宽度为25 m,采高为5 m,并与中硬岩层的模拟结果进行对比,体现出软弱岩层在模拟中的破坏程度。With the mining of theⅡ3 coal seam under goaf in soft rock of Lingdong coal mine as the background,three factors such as the length of the working face,the width of the sectional coal pillar and the mining height are selected for orthogonal test design,and the FLAC^(3 D) numerical software is used to simulate the working face under different combinations of factors.The damage of the rock,analyze the influence of each factor on the damage of the overburden of the working face.The test results show that the significant order of the influence of various factors on the roof failure height ofⅡ3 coal seam is:height of mining>length of working face>section pillar width.Based on the analysis of the numerical simulation results,combining with the influence curves of various factors on the height of the water-conducting fissure zone,and following the basic principles of safe and efficient production of coal mines,the reasonable size combination ofⅡ3 coal seam working face is determined as the length of the working face is 250 m,and the width of the sectional coal pillar is 25 m and the mining height is 5 m,and comparing with the simulation results of medium-hard rock formation,reflecting the damage degree of soft rock formation in the simulation.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.201